
They had to jackhammer out the drain for the shower, which was very loud and scared the dogs (and me!) this morning. They wouldn't let me use the jackhammer, though. I really wanted to!

The double wall is up for the wine cellar, and the wall with the French door is up. I discovered that we have to have a 36" door to the storage area, because it has a furnace. It makes no sense to me, because the door downstairs is only 32". Ah, well. Looks pretty good. They need to wrap the beam and build the coffering in the theater still, which has to be in place so we can do the wiring.

The electrician is coming tonight to do a planning session and make sure we get everything we need in place. With the theater, there are some specific locations that are required for speakers and things, and we need to get cable and phone in the right places, too. I have three drawings (electrical oddities, lighting, theater speaker placement and wiring. I suppose I could let them handle all of this themselves, but this way, I know I get what I want. So I have lists and memos and I write everything down.
I think the plumber, at least, thinks I'm a lunatic. But at least he doesn't have the tools to wall me up in the basement if I become too much of a pest.
No comments:
Post a Comment